null

Case Studies

Magna LED Lighting Case Study

 

The Safety Source provided a free no-cost, no-obligation proposal and secured the largest energy rebate available from DTE Energy. The Safety Source worked around the hectic ever changing production schedule at this facility. The entire building envelope was retrofitted with energy efficient LED fixtures and lamps, including high bay, task, inspection, office fixtures as well as all parking lot and wall packs on the exterior of the 350,000 sq. ft. facility. Saving Magna $100,800 annually in energy costs.


Fisher LED Lighting Case Study

The Safety Source provided a free no-cost, no-obligation proposal and once approved handled the application paper work in order to secure the largest energy rebate available from DTE Energy. Fisher Dynamics received nearly $22,000 in DTE Energy incentives, including a $2,500 DTE Energy Multi-Measure Bonus. Company officials said that all the upgrades will save an estimated 306,000 in annual kWh savings and nearly $34,000 in annual energy costs.


Bielomatik LED Lighting Case Study

The Safety Source provided a free no-cost, no-obligation proposal and once approved handled the application paper work with DTE Energy in order to secure the largest energy rebate available. The entire building envelope was retrofitted with energy efficient LED fixtures and lamps, including high bay,task, inspection, office fixtures as well as all parking lot and wall packs on the exterior of their facility.


Neapco LED Lighting Case Study

The Safety Source provided a free no-cost, no-obligation proposal and once approved handled the application paper work in order to secure the largest energy rebate available from DTE Energy. Neapco received nearly $81,000 in DTE Energy incentives. The LED upgrades will reduce carbon emissions by an estimated 3,125,253 lbs and save nearly $163,530 in annual energy costs.


Flex-N-Gate LED Lighting Case Study

The Safety Source provided a free no-cost, no-obligation proposal and once approved handled the application paper work in order to secure the largest energy rebate available from DTE Energy. Flex-N-Gate received over $32,000 in DTE Energy incentives. Company officials said that all the upgrades will save an estimated 442,000 in annual kWh savings and nearly $48,615 in annual energy costs.

Wyman-Gordan Collision Awareness Case Study

The Safety Source did a full walk-through of Wyman-Gordans facility to find any blind spots, corners, office areas, and any other potential areas where a fork truck collision could happen. We determined which collision awareness systems would be apropriate in every area of the facility. Each of these systems uses motion sensors and lights to alert both pedestrians and operators of oncoming traffic.

Magna Seating Mezzanine Case Study

The Safety Source allocated new space while minimizing lateral footprint by expanding vertically with a two-story mezzanine as well as implant offices.

 


IAC Mendon LED Lighting Case Study

The Safety Source provided a free no-cost, no-obligation proposal and once approved handled the application paper work in order to secure the largest energy rebate available from Consumers Energy. IAC Mendon received over $120,000 in Consumers Energy incentives. Company officials said that all the upgrades will save an estimated 1,205,038 in annual kWh savings and nearly $145,000 in annual energy costs.

Trust Guard Security Scanned